Smile Inc v OP3 International: Defective Construction & Flooding at Suntec City Clinic
Smile Inc Dental Surgeons Pte Ltd sued OP3 International Pte Ltd in the High Court of Singapore on October 5, 2017, for damages and losses resulting from defective fitting-out works at their Suntec City clinic. Smile Inc claimed OP3's negligence led to two flooding incidents and the forfeiture of a fitting-out deposit. OP3 counterclaimed for unpaid sums. The court found OP3 liable for the defective design and construction of the drainage system, which caused the flooding, and for the forfeiture of the fitting-out deposit. The court ordered interlocutory judgment for Smile Inc, with damages to be assessed, and allowed OP3's counterclaim in part, to be set off against Smile Inc's damages.
1. Case Overview
1.1 Court
High Court of the Republic of Singapore1.2 Outcome
Interlocutory judgment for the plaintiff with damages to be assessed.
1.3 Case Type
Civil
1.4 Judgment Type
Judgment
1.5 Jurisdiction
Singapore
1.6 Description
Dental clinic sues OP3 for damages due to defective fitting-out works causing flooding. Court finds OP3 liable for design flaws and orders damages.
1.7 Decision Date
2. Parties and Outcomes
Party Name | Role | Type | Outcome | Outcome Type | Counsels |
---|---|---|---|---|---|
Smile Inc Dental Surgeons Pte Ltd | Plaintiff | Corporation | Interlocutory Judgment | Partial | |
OP3 International Pte Ltd | Defendant | Corporation | Counterclaim Allowed in Part | Partial |
3. Judges
Judge Name | Title | Delivered Judgment |
---|---|---|
Chan Seng Onn | Judge | Yes |
4. Counsels
4. Facts
- Plaintiff hired defendant for fitting-out works at Suntec City clinic.
- Works included plumbing system for dental chairs.
- Plaintiff required completion by September 11, 2013.
- Two flooding incidents occurred due to drainage issues.
- Defendant failed to provide as-built drawings.
- Plaintiff's fitting-out deposit was forfeited.
- Defendant counterclaimed for unpaid balance and variation works.
5. Formal Citations
- Smile Inc Dental Surgeons Pte Ltd v OP3 International Pte Ltd, Suit No 498 of 2015, [2017] SGHC 246
6. Timeline
Date | Event |
---|---|
Plaintiff appointed interior designer, Mr Peter Tay. | |
Defendant submitted a quotation for the Works. | |
Initial completion date for the Works. | |
Defendant sent a revised work schedule to Ms Chong. | |
Extended deadline for completion of the Works. | |
Grand opening of the refurbished Suntec City Mall. | |
Latest date the Suntec Clinic would have been handed over to the plaintiff. | |
Plaintiff commenced operations in the Suntec Clinic. | |
Plaintiff found mould growing on the walls of the filing room. | |
First Flood occurred at the Suntec Clinic; plaintiff closed the clinic. | |
Defendant returned possession of the Suntec Clinic to the plaintiff. | |
Plaintiff discovered mould growth again. | |
Second Flood occurred at the Suntec Clinic; plaintiff closed the clinic. | |
Suntec Clinic remained closed. | |
Suit No 498 of 2015 filed. | |
MCST forfeited the Fitting-Out Deposit. | |
Trial began. | |
Judgment reserved. | |
Judgment delivered. |
7. Legal Issues
- Breach of Contract
- Outcome: The court found that the defendant breached the contract by failing to complete the works by the agreed deadline, providing a defective design, and failing to provide as-built drawings.
- Category: Substantive
- Sub-Issues:
- Failure to complete works by deadline
- Defective design and construction
- Failure to provide as-built drawings
- Negligence
- Outcome: The court found that the defendant was negligent in its design and construction of the drainage system, which led to the flooding incidents.
- Category: Substantive
- Sub-Issues:
- Failure to exercise reasonable care, skill, and diligence
- Defective design and construction leading to flooding
- Implied Terms
- Outcome: The court found that there was an implied term in the agreement that the defendant was to provide other drawings and documents for the Works, including final layout drawings, M&E drawings, and documents such as endorsements by licensed personnel engaged by the defendant, which were necessary for the Fitting-Out Deposit to be released.
- Category: Substantive
- Sub-Issues:
- Fitness for purpose
- Duty of care
- Related Cases:
- [2013] 4 SLR 193
8. Remedies Sought
- Monetary Damages
9. Cause of Actions
- Breach of Contract
- Negligence
10. Practice Areas
- Construction Law
- Commercial Litigation
11. Industries
- Construction
- Healthcare
12. Cited Cases
Case Name | Court | Affirmed | Citation | Jurisdiction | Significance |
---|---|---|---|---|---|
Sembcorp Marine Ltd v PPL Holdings Pte Ltd and another and another appeal | Court of Appeal | Yes | [2013] 4 SLR 193 | Singapore | Cited for the three-stage test for the implication of terms in a contract. |
13. Applicable Rules
Rule Name |
---|
No applicable rules |
14. Applicable Statutes
Statute Name | Jurisdiction |
---|---|
No applicable statutes |
15. Key Terms and Keywords
15.1 Key Terms
- Fitting-out works
- Drainage system
- As-built drawings
- Bunded Area
- Floor Grating
- Defective design
- Flooding
- Variation works
15.2 Keywords
- construction
- contract
- negligence
- singapore
- dental clinic
- flooding
- fitting-out
- defective works
17. Areas of Law
Area Name | Relevance Score |
---|---|
Construction Law | 90 |
Damages | 80 |
Breach of Contract | 70 |
Contract Law | 60 |
Property Damage | 50 |
Building and Construction Related Contracts | 50 |
Contractual Duties | 40 |
Personal Injury | 10 |
16. Subjects
- Construction Dispute
- Contract Law
- Negligence