Kalzip Asia v BFG International: GRP Panel Defects & Breach of Contract

Kalzip Asia Pte Ltd, the Plaintiff, sued BFG International Ltd, the Defendant, in the High Court of Singapore, Suit No 610 of 2013, on 29 June 2018, for breach of contract relating to alleged defects in glass-reinforced plastic (GRP) panels installed on the Marina Bay Sands Integrated Resort Development. Kalzip claimed that BFG failed to produce GRP panels that met the structural performance and fire safety requirements of the Sub-Contract. The court dismissed Kalzip’s claim.

1. Case Overview

1.1 Court

High Court of the Republic of Singapore

1.2 Outcome

Plaintiff's claim dismissed

1.3 Case Type

Civil

1.4 Judgment Type

Judgment

1.5 Jurisdiction

Singapore

1.6 Description

Kalzip Asia sued BFG International over defective GRP panels in the Marina Bay Sands project. The court dismissed Kalzip's claim for breach of contract.

1.7 Decision Date

2. Parties and Outcomes

Party NameRoleTypeOutcomeOutcome TypeCounsels
MARINA BAY SANDS PTE LTDOtherCorporation
Kalzip Asia Pte LtdPlaintiffCorporationClaim DismissedDismissed
BFG International LtdDefendantCorporationJudgment for DefendantWon

3. Judges

Judge NameTitleDelivered Judgment
Quentin LohJudgeYes

4. Counsels

4. Facts

  1. Kalzip contracted with MBS to provide a roofing system for three buildings.
  2. Kalzip engaged BFG to supply glass-reinforced plastic-faced aluminium panels for the Project.
  3. Kalzip complained that delamination of the GRP panels had been observed during installation.
  4. MBS lost confidence in the panels and decided to replace them with aluminium panels.
  5. MBS deducted S$8,685,495.74 from Kalzip’s final account for costs incurred due to the defective GRP panels.
  6. Kalzip commenced arbitration against MBS and later settled for S$5.5m.
  7. Kalzip then sued BFG for S$14,040,957.64 for breach of contract and S$4,874,319.45 in restitution.

5. Formal Citations

  1. Kalzip Asia Pte Ltd v BFG International Ltd, Suit No 610 of 2013, [2018] SGHC 152

6. Timeline

DateEvent
Kalzip signed a Trade Contract with Marina Bay Sands Pte Ltd
Kalzip engaged BFG to supply glass-reinforced plastic-faced aluminium panels
Kalzip installed panels on the casino building roof
Kalzip installed panels on the MICE building roof
Kalzip complained of delamination of the GRP panels
MBS omitted the theatre panels from Kalzip’s scope of works
MBS informed Kalzip that it had appointed a third party contractor to remove and replace the GRP panels
MBS instructed Craft Facade Pte Ltd to remove the GRP panels and install replacement aluminium panels
Kalzip commenced arbitration proceedings against MBS
Kalzip and MBS entered into a Settlement Agreement
Kalzip sent a letter of demand to BFG for the sum of S$13m
Kalzip commenced the Suit against BFG
Judgment reserved

7. Legal Issues

  1. Breach of Contract
    • Outcome: The court held that the Plaintiff had not proven that the Defendant breached the contract.
    • Category: Substantive

8. Remedies Sought

  1. Monetary Damages
  2. Restitution

9. Cause of Actions

  • Breach of Contract
  • Restitution

10. Practice Areas

  • Commercial Litigation
  • Construction Dispute

11. Industries

  • Construction

12. Cited Cases

Case NameCourtAffirmedCitationJurisdictionSignificance
No cited cases

13. Applicable Rules

Rule Name
No applicable rules

14. Applicable Statutes

Statute NameJurisdiction
Sale of Goods ActSingapore

15. Key Terms and Keywords

15.1 Key Terms

  • GRP panels
  • Delamination
  • Sub-Contract
  • Structural performance
  • Fire safety
  • Deflection
  • Honeycomb core
  • Inner skin
  • MBS
  • Kalzip Roofing System

15.2 Keywords

  • GRP panels
  • delamination
  • breach of contract
  • construction
  • Singapore
  • Marina Bay Sands

17. Areas of Law

16. Subjects

  • Construction Dispute
  • Contract Law
  • Defective Materials