Kalzip Asia v BFG International: GRP Panel Defects & Breach of Contract
Kalzip Asia Pte Ltd, the Plaintiff, sued BFG International Ltd, the Defendant, in the High Court of Singapore, Suit No 610 of 2013, on 29 June 2018, for breach of contract relating to alleged defects in glass-reinforced plastic (GRP) panels installed on the Marina Bay Sands Integrated Resort Development. Kalzip claimed that BFG failed to produce GRP panels that met the structural performance and fire safety requirements of the Sub-Contract. The court dismissed Kalzip’s claim.
1. Case Overview
1.1 Court
High Court of the Republic of Singapore1.2 Outcome
Plaintiff's claim dismissed
1.3 Case Type
Civil
1.4 Judgment Type
Judgment
1.5 Jurisdiction
Singapore
1.6 Description
Kalzip Asia sued BFG International over defective GRP panels in the Marina Bay Sands project. The court dismissed Kalzip's claim for breach of contract.
1.7 Decision Date
2. Parties and Outcomes
Party Name | Role | Type | Outcome | Outcome Type | Counsels |
---|---|---|---|---|---|
MARINA BAY SANDS PTE LTD | Other | Corporation | |||
Kalzip Asia Pte Ltd | Plaintiff | Corporation | Claim Dismissed | Dismissed | |
BFG International Ltd | Defendant | Corporation | Judgment for Defendant | Won |
3. Judges
Judge Name | Title | Delivered Judgment |
---|---|---|
Quentin Loh | Judge | Yes |
4. Counsels
4. Facts
- Kalzip contracted with MBS to provide a roofing system for three buildings.
- Kalzip engaged BFG to supply glass-reinforced plastic-faced aluminium panels for the Project.
- Kalzip complained that delamination of the GRP panels had been observed during installation.
- MBS lost confidence in the panels and decided to replace them with aluminium panels.
- MBS deducted S$8,685,495.74 from Kalzip’s final account for costs incurred due to the defective GRP panels.
- Kalzip commenced arbitration against MBS and later settled for S$5.5m.
- Kalzip then sued BFG for S$14,040,957.64 for breach of contract and S$4,874,319.45 in restitution.
5. Formal Citations
- Kalzip Asia Pte Ltd v BFG International Ltd, Suit No 610 of 2013, [2018] SGHC 152
6. Timeline
Date | Event |
---|---|
Kalzip signed a Trade Contract with Marina Bay Sands Pte Ltd | |
Kalzip engaged BFG to supply glass-reinforced plastic-faced aluminium panels | |
Kalzip installed panels on the casino building roof | |
Kalzip installed panels on the MICE building roof | |
Kalzip complained of delamination of the GRP panels | |
MBS omitted the theatre panels from Kalzip’s scope of works | |
MBS informed Kalzip that it had appointed a third party contractor to remove and replace the GRP panels | |
MBS instructed Craft Facade Pte Ltd to remove the GRP panels and install replacement aluminium panels | |
Kalzip commenced arbitration proceedings against MBS | |
Kalzip and MBS entered into a Settlement Agreement | |
Kalzip sent a letter of demand to BFG for the sum of S$13m | |
Kalzip commenced the Suit against BFG | |
Judgment reserved |
7. Legal Issues
- Breach of Contract
- Outcome: The court held that the Plaintiff had not proven that the Defendant breached the contract.
- Category: Substantive
8. Remedies Sought
- Monetary Damages
- Restitution
9. Cause of Actions
- Breach of Contract
- Restitution
10. Practice Areas
- Commercial Litigation
- Construction Dispute
11. Industries
- Construction
12. Cited Cases
Case Name | Court | Affirmed | Citation | Jurisdiction | Significance |
---|---|---|---|---|---|
No cited cases |
13. Applicable Rules
Rule Name |
---|
No applicable rules |
14. Applicable Statutes
Statute Name | Jurisdiction |
---|---|
Sale of Goods Act | Singapore |
15. Key Terms and Keywords
15.1 Key Terms
- GRP panels
- Delamination
- Sub-Contract
- Structural performance
- Fire safety
- Deflection
- Honeycomb core
- Inner skin
- MBS
- Kalzip Roofing System
15.2 Keywords
- GRP panels
- delamination
- breach of contract
- construction
- Singapore
- Marina Bay Sands
17. Areas of Law
Area Name | Relevance Score |
---|---|
Breach of Contract | 95 |
Contract Law | 90 |
Construction Law | 70 |
Contractual terms | 60 |
Construction Litigation | 60 |
Construction | 50 |
Fire Safety Engineering | 40 |
Arbitration | 40 |
Evidence | 30 |
Architectural Engineering | 30 |
Damages | 30 |
Measure of Damages | 20 |
16. Subjects
- Construction Dispute
- Contract Law
- Defective Materials